The design engineer was on site with the drillers to check our scan marks and do some test drills.
The scope of the job was to mark out the reinforcement of a 500 – 1000mm thick wall. The design engineer was on site with the drillers to check our scan marks and do some test drills.
It was an interesting job where two technicians were on-site scanning and two were off-site analysing.
We used excel spreadsheets to export scan data, which was spontaneous, easy to interpret and mark out on site.
The reinforcing was quite dense in some locations and the contractor ended up coring at 5 locations to test. All 5 locations were cored up to 500mm without hitting any reinforcement. This was quite a benefit and a successful outcome for the project.