Concrete Structure Investigations COVID-19 advice for clients

expand_more
close

Hello valued clients and contacts,

Concrete Structure Investigation’s response to the Covid-19 Level 3 alert, with the upgrade to Level 4 Wednesday midnight:

CSI can continue to work remotely on your queries for pricing and completing reports where data has already been collected., as our team can work remotely on these and share electronically for peer review.

CSI can go to site where the work is for Essential Services, but we will not be able to attend non-essential site work until the current Level is downgraded.

As with the rest of the country, we are very sorry not to be able to progress your business requirements beyond the points above. We wish you all to be safe and let’s hope we can beat the spread of the virus and be back to work as soon as possible.

If you are contacting us about some pricing here are some really good tips so that we can get it right for you:

To assist CSI’s representatives with ensuring that we can provide you with the most cost effective, accurate and timely pricing and service we request you please share with us any information that you may have about the structure or building you are enquiring about. Sending us all drawings, photos and any other relevant information will ultimately benefit your project and allow us to be more informed. Please see below for a list of required information.

If you have any of the below information please share it with us

  • As built plans (Structural and architectural)
  • Scoping Documents
  • Photos
  • Hazzard registers and health and safety plans
  • Asbestos registers

If you have information and are unsure that it is useful please do send it to us regardless, to be able to provide our best service we require to be informed.

Please contact Kurtis 0800 33 77 67 if you have any questions.

Best regards, The Team at CSI

Holcim Silos PIT Testing

CSI was engaged by Fulton Hogan to undertake Pile Integrity Testing of 12 piles.

Project Requirements

CSI was engaged by Fulton Hogan to undertake pile integrity testing of 12 piles. These piles were designed 1800mm nominal diameter, drilled and poured using a temporary sleeve and ranged in length between 22 and 23 meters long. The intention of Pile Integrity Testing (PIT)  (see our services page) is to ensure that the piles have no major defects in place throughout the length of the pile.

Holcim Silos PIT Testing
Holcim Silos PIT Testing
Holcim Silos PIT Testing

Solutions

The CSI PIT low strain integrity test was used to assess the condition of the cast-in-place piles.

CSI worked with Fulton Hogan and the client ensuring that our work was undertaken in a safe manner and ensuring that our work was efficiently scheduled into the construction programme, CSI carried out site testing over two half days and provided a final report within 7 days of testing.


Benefits of Solutions

The PIT enabled Fulton Hogan to continue with progress in construction and demonstrate the quality of their construction. This is the Testimonial provided by Fulton Hogan’s Rhys Collins

”Engaging CSI to conduct the Pile Integrity Testing on the large 1.8m diameter piles was a wise choice. Their technicians were knowledgeable, approachable, punctual, health and safety conscious and flexible when we encountered late changes to the works programme. Results were delivered in a timely and well-presented manner. A pleasure to work with.”