July 6th, 2017 / Projects
We were recently engaged by structural engineers to assist them in determining the properties of two unreinforced masonry (URM) walls of their...
June 16th, 2017 / Projects
The global ‘climate change effect’ seems to pose a threat to motorists on our motorways here in New Zealand. Once upon a time, our...
April 20th, 2017 / Projects
Concrete quality at a local Sewerage Treatment Plant had come into question. The potential for corrosion of the reinforcing inside the concrete...
January 26th, 2017 / Projects
We were asked to test three piles at the Ngaio Gorge in Wellington. The client needed Pile Integrity Tests to gather information about the...
January 26th, 2017 / Projects
CSI were recently requested to check the quality of the pile pour at a Wellington apartment development. The following case study details the...
June 14th, 2021 / Heritage Projects
A seismic assessment was required to be done on the Equippers Church, located at 9 Mercury Lane in Auckland.
June 1st, 2016 / Heritage Projects
Working on this heritage building located in Auckland, NZ was our largest job to date. We worked on this project for months doing extensive and...
April 30th, 2016 / Projects
Working on the Snells Algies Pipe Bridge was a great experience because it was the first time we took on a project that required nearly all the...